<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" ID="1681">
<titleInfo>
<title>Integrated Cost and Schedule Control for Construction Projects</title>
</titleInfo>
<name type="Personal Name" authority="">
<namePart>Mueller, Fredrick Wm</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<typeOfResource manuscript="yes" collection="yes">mixed material</typeOfResource>
<genre authority="marcgt">bibliography</genre>
<originInfo>
<place><placeTerm type="text">Australia</placeTerm></place>
<publisher>Van Nostrand Reinhold Company</publisher>
<dateIssued>1986</dateIssued>
<issuance>monographic</issuance>
<edition></edition>
</originInfo>
<language>
<languageTerm type="code">en</languageTerm>
<languageTerm type="text">English</languageTerm>
</language>
<physicalDescription>
<form authority="gmd">Text</form>
<extent>504p</extent>
</physicalDescription>
<note>Management and administrative processes within the construction industry have been undergoing major changes in the last several decades. These changes have involved significant adjustments in management science and manage­ ment techniques, brought about by the need for contemporary valid informa­ tion with which to manage the construction process. In short, management in the construction industry is changing significantly; change will continue at an accelerated pace at least through the next decade. The responses required of construction industry management are now resulting in a movement away from an entrepreneurial management style to professional management tech­ niques and procedures.</note>
<subject authority=""><topic>Building Estimates</topic></subject>
<classification>692.5</classification><identifier type="isbn">978461597520</identifier><location>
<physicalLocation>Podomoro University Digital Library</physicalLocation>
<shelfLocator>692.5 Mue i</shelfLocator>
<holdingSimple>
<copyInformation>
<numerationAndChronology type="1">2017.04.1867</numerationAndChronology>
<sublocation>My Library</sublocation>
<shelfLocator>692.5 Mue i</shelfLocator>
</copyInformation>
</holdingSimple>
</location>
<slims:image>Integrated_Cost_and_Schedule_Control.jpg.jpg</slims:image>
<recordInfo>
<recordIdentifier>1681</recordIdentifier>
<recordCreationDate encoding="w3cdtf">2017-04-20 16:07:32</recordCreationDate>
<recordChangeDate encoding="w3cdtf">2018-02-13 15:48:40</recordChangeDate>
<recordOrigin>machine generated</recordOrigin>
</recordInfo></mods></modsCollection>