<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" ID="450">
<titleInfo>
<title>Construction Cost Management:</title>
<subTitle>Learning from Case Studies</subTitle>
</titleInfo>
<name type="Personal Name" authority="">
<namePart>Potts, Keith & Ankrah, Nii</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<typeOfResource manuscript="yes" collection="yes">mixed material</typeOfResource>
<genre authority="marcgt">bibliography</genre>
<originInfo>
<place><placeTerm type="text">New York</placeTerm></place>
<publisher>Routledge</publisher>
<dateIssued>2013</dateIssued>
<issuance>monographic</issuance>
<edition>2nd Ed.</edition>
</originInfo>
<language>
<languageTerm type="code">en</languageTerm>
<languageTerm type="text">English</languageTerm>
</language>
<physicalDescription>
<form authority="gmd">Text</form>
<extent>367p</extent>
</physicalDescription>
<relatedItem type="series">
<titleInfo>
<title>Learning from Case Studies</title>
</titleInfo>
</relatedItem>
<note>In this update key issues in construction cost management across the building and civil engineering sectors, both in the UK and overseas. Best practice from pre-contract to post-contract phases of the project life-cycle is illustrated using over 70 case studies, including major projects such as Hetahrow Terminal 5, Crossrail and the London 2012 olympics.</note>
<subject authority=""><topic>Construction</topic></subject>
<subject authority=""><topic>Construction Finance</topic></subject>
<subject authority=""><topic>Construction Management</topic></subject>
<classification>624.068\'1</classification><identifier type="isbn">9780415629133</identifier><location>
<physicalLocation>Podomoro University Digital Library</physicalLocation>
<shelfLocator>624.068\'1 Pot c</shelfLocator>
<holdingSimple>
<copyInformation>
<numerationAndChronology type="1">2015.07.0739</numerationAndChronology>
<sublocation>My Library</sublocation>
<shelfLocator>624.068\'1 Pot c</shelfLocator>
</copyInformation>
<copyInformation>
<numerationAndChronology type="1">2015.07.0740</numerationAndChronology>
<sublocation>My Library</sublocation>
<shelfLocator>624.068\'1 Pot c</shelfLocator>
</copyInformation>
</holdingSimple>
</location>
<slims:image>Construction_Cost_Management.jpg.jpg</slims:image>
<recordInfo>
<recordIdentifier>450</recordIdentifier>
<recordCreationDate encoding="w3cdtf">2015-07-13 15:23:19</recordCreationDate>
<recordChangeDate encoding="w3cdtf">2015-07-13 15:24:24</recordChangeDate>
<recordOrigin>machine generated</recordOrigin>
</recordInfo></mods></modsCollection>