<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" ID="4621">
<titleInfo>
<title>Bill of Quantity Pekerjaan Arsitektur Proyek Apartemen Kemang Penthouse</title>
</titleInfo>
<name type="Personal Name" authority="">
<namePart>Jenius, Steven</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<typeOfResource manuscript="yes" collection="yes">mixed material</typeOfResource>
<genre authority="marcgt">bibliography</genre>
<originInfo>
<place><placeTerm type="text">Jakarta</placeTerm></place>
<publisher>Podomoro University</publisher>
<dateIssued>2020</dateIssued>
<issuance>monographic</issuance>
<edition>Batch 3</edition>
</originInfo>
<language>
<languageTerm type="code">id</languageTerm>
<languageTerm type="text">Indonesia</languageTerm>
</language>
<physicalDescription>
<form authority="gmd">Text</form>
<extent></extent>
</physicalDescription>
<note>Apartments are attractive to consumers because they are practical, have adequate facilities, and are very suitable for dense areas with limited land area. For this reason, business people have invested heavily in apartment development projects in various areas of Jakarta. Investment in apartment construction requires high funds, so it takes an accurate estimate from experienced engineer. One estimate made is the estimated quantity of construction work. In building apartment projects, there are several construction works, namely structural, architectural, mechanical, electrical, plumbing, and landscape works. Each work has a quantity must be measured properly based on the design drawings. The quantity of work will be poured into a construction document called Bill of Quantity (BQ). This final project produces BQ architectural work on the Kemang Penthouse Apartment project. The preparation of the final project architectural work BQ is divided based on sequence apartment floor from the basement to the roof floor. Each floor consists of several works, namely wall work, floor work, ceiling work, door work, sanitation work, and stair work. Decomposition of the work on BQ is prepared using WBS with the top-down method. The BQ volume calculation standard in this final project refers to SMPI (Indonesian Calculation Method Standard)</note>
<subject authority=""><topic>Prodi Manajemen Rekayasa Konstruksi</topic></subject>
<classification>NONE</classification><identifier type="isbn"></identifier><location>
<physicalLocation>Podomoro University Digital Library</physicalLocation>
<shelfLocator></shelfLocator>
<holdingSimple>
<copyInformation>
<numerationAndChronology type="1">MRK.TA20.00019</numerationAndChronology>
<sublocation>My Library</sublocation>
<shelfLocator></shelfLocator>
</copyInformation>
</holdingSimple>
</location>
<slims:image>steven_jenius_page-0001.jpg.jpg</slims:image>
<recordInfo>
<recordIdentifier>4621</recordIdentifier>
<recordCreationDate encoding="w3cdtf">2020-02-13 10:47:05</recordCreationDate>
<recordChangeDate encoding="w3cdtf">2021-04-29 11:27:47</recordChangeDate>
<recordOrigin>machine generated</recordOrigin>
</recordInfo></mods></modsCollection>